The White Mill Blog

The renovation of The White Mill

Documenting design, demolition, construction and finishing

The White Mill blog was a unique space set up to showcase and document the renovation of The White Mill. All aspects of the renovation were documented including design, demolition, construction and finishing. The process began in September of 2009 and continued until completion in June 2010. The blog feed below is a collection of all of The White Mill posts, and is reposted with the kind permission of The White Mill Blog for your convenience.

Tuesday, November 3, 2009

Week 4 update: Interior Changes

I know we have to get some before pictures and some design drawings up, but in the meantime, here are some "before" and "in progress" shots of changes taking place in the great room and stair hall:

Before:

In Progress:

That big opening will be a set of doors that will open up to the screened porch replacing the small door and dated bookcases.

Before:

In Progress:

In the stairway we are also opening up, replacing a smaller window with a larger window that will call attention to this element from the exterior (as you will see in the next post).

Visit our showroom

Please call 203-431-9104 to schedule a complimentary design consultation or to make an appointment to visit our showroom. Our showroom is open from 9-5 Monday through Friday, and by appointment weekends and evenings.

Get A Quote