The White Mill Blog

The renovation of The White Mill

Documenting design, demolition, construction and finishing

The White Mill blog was a unique space set up to showcase and document the renovation of The White Mill. All aspects of the renovation were documented including design, demolition, construction and finishing. The process began in September of 2009 and continued until completion in June 2010. The blog feed below is a collection of all of The White Mill posts, and is reposted with the kind permission of The White Mill Blog for your convenience.

Sunday, July 4, 2010

Interior Pictures

At long last here are some pictures of the interior. We had our building team over for dinner on Wednesday night, include David, Ray and Allison. It was the first meal out on the screened porch and reason enough to get the porch set up and take some pictures of everything else.

Kitchen:

From Front Hall to Living Room (Kitchen on left)

Living Room:

Dining Room:

Screened Porch:

Stairway:

Guest Bath:

Master Bedroom Dressing Hall:

Bathroom:

Bedroom:

Thanks for looking and thanks to everyone who helped along the way... I may still do some pages of before and afters, but for now this is likely the last posting... Have a great Fourth! (If you would have told us last Fourth of July I would be sitting in the air conditioned comfort of my fully renovated living room writing this blog, I would probably still have doubted you... its way too good to be true!)

Visit our showroom

Please call 203-431-9104 to schedule a complimentary design consultation or to make an appointment to visit our showroom. Our showroom is open from 9-5 Monday through Friday, and by appointment weekends and evenings.

Get A Quote