The White Mill Blog

The renovation of The White Mill

Documenting design, demolition, construction and finishing

The White Mill blog was a unique space set up to showcase and document the renovation of The White Mill. All aspects of the renovation were documented including design, demolition, construction and finishing. The process began in September of 2009 and continued until completion in June 2010. The blog feed below is a collection of all of The White Mill posts, and is reposted with the kind permission of The White Mill Blog for your convenience.

Thursday, May 6, 2010

Floors are stained...

... and looking great!

And these last two are of the original floor that was refinished in the front hallway:

This is probably one of the last posts. The decorative lighting is being installed as we speak; then we will move in!

Visit our showroom

Please call 203-431-9104 to schedule a complimentary design consultation or to make an appointment to visit our showroom. Our showroom is open from 9-5 Monday through Friday, and by appointment weekends and evenings.

Get A Quote